Motorists traveling between Cavite, Laguna, and Metro Manila are expected to benefit from shorter travel times and improved road connectivity as Metro Pacific Tollways South (MPT South) targets the December opening of three remaining road components of the Cavite-Laguna Expressway (CALAX) and the CAVITEX-CALAX Link (CCLink).

The three components scheduled for simultaneous opening are CALAX Subsections 1 and 2, and the 1.2-kilometer CCLink.
CALAX Subsection 1 spans 7.22 kilometers, connecting Centennial Road in Kawit to the Open Canal Interchange in Imus City. Once operational, the section is projected to reduce travel time between the two points from approximately 25 minutes to just eight minutes.
Another CALAX section is expected to cut travel time from 20 minutes to 11 minutes, further improving mobility for motorists traveling within the province.

Meanwhile, the CCLink will provide a direct connection between CAVITEX and CALAX, allowing motorists to transfer between the two expressways without passing through several local roads.
The additional road connections are expected to provide more convenient travel options, potentially reduce fuel consumption, and improve traffic movement, particularly for commuters and motorists regularly traveling between Cavite and Laguna.
MPT South presented the developments to media practitioners from the CALABARZON region during a site tour on Saturday, November 21, as preparations continue for the targeted simultaneous opening of the three road components in December.

Once operational, the new connections are expected to strengthen the expressway network in South Luzon and support the growing transportation and mobility needs of communities and businesses across the region.

- Tanza Growth: Connectivity and Communities Drive Demand - November 25, 2026
- CALAX, CAVITEX Link Target December Opening - November 24, 2026
- Honda Plants 400 Kamagong Seedlings in Batangas, Laguna for Environmental Protection - November 18, 2026